One detail in the first unit repeats in every unit behind it. Multifamily scope gets priced per unit type and confirmed on unit one, so what you approve is what stacks.

Finished unit interior with french doors, base, and casing installed
Repetition

The first unit sets the cost of the whole building

A quarter inch of extra scribe per opening is invisible in one unit and a month of labor in a hundred and twenty. Multifamily gets estimated and run accordingly.

Priced by unit type, not by building

Each type gets its own takeoff and its own number, so a change to the two bedroom plan does not force a reprice of everything else.

Mockup unit approved in writing

Unit one is built, walked, and signed off before production starts. That signature is what the remaining units get measured against.

Door and hardware schedules by type

Openings, swings, and hardware sets are confirmed per unit type at buyout, which is where multifamily door packages usually go wrong.

Production planned by stack

Crews run vertically through stacks rather than wandering the floor, so material staging, counts, and daily output stay predictable.

Schedule

Floors released as they finish, not all at the end

Occupancy usually comes floor by floor, and your finish sub either supports that or becomes the reason it slips.

01

Turnover by floor

Units get completed, punched, and documented in the order your certificate of occupancy needs them, so leasing can start on the lower floors while the upper stack is still in production.

02

Common areas on their own track

Lobby, corridors, amenity, and mail rooms carry different detail and a different inspection than the units do. They get sequenced separately instead of being squeezed in after the last unit.

03

Punch handled inside the run

Finish scope delays don't fix themselves. Each unit gets closed out as the crew leaves it, which is the only reason a punch list on a hundred unit building stays a list instead of a second project.

04

Crew scaled to the schedule

Headcount goes up when the stack opens up and comes down when it does not. You are not paying for a crew waiting on drywall, and you are not short when three floors release at once.

In the field

Unit scope: trim, doors, cabinets, and baths

Scope shown: unit trim and door packages, kitchen and vanity cabinet installation, and bath finish work of the type that repeats unit by unit.

Scope

What a multifamily package covers

Unit trim and casing

Base, casing, and window trim run to the approved unit detail, the same way in every unit of that type.

Door and hardware by unit type

Entry, closet, and passage openings with hardware sets confirmed per type before the first delivery.

Cabinet and vanity installation

Kitchen and bath casework set, scribed, and hardware installed, counted against the unit schedule.

Closet and storage systems

Shelving, rods, and closet build outs that repeat across the plan.

Corridor and amenity millwork

Paneling, wall detail, and fixed casework in common areas and leasing space.

Stairs, railings, and guardrails

Egress stairs and railing assemblies installed to code and to the inspection dates.

Before production

What gets confirmed before the first unit is built

Unit type count, the detail for each type, hardware sets, blocking locations, and the release order your schedule expects. Those five items get agreed in writing at buyout, and they are what a multifamily finish package lives or dies on.

Clear documentation prevents costly misunderstandings.

COI, W-9, license, safety plan, and SDS available on request.

Multifamily finish package in preconstruction?

Send us your plans and get a detailed scope review back within one business day, at no cost.