Send Your Plans
Siding & Exterior

Siding & Exterior

Exterior envelope, decks, and trim: lap, shingle, and fiber cement siding, with the decks, railings, and flashing that tie into the finish scope.

Siding on an active jobsite
What We Deliver

The siding scope, item by item

Lap, shingle, and fiber cement siding, exterior trim, decks and rail systems, and flashing, executed to project drawings and field conditions.

01

Lap & Clapboard Siding

Horizontal lap and clapboard installed to consistent exposure, with straight lines and even courses.

02

Shingle & Shake Siding

Cedar shingle and shake installed to even reveal, keyed and staggered across the wall.

03

Fiber Cement Siding

Fiber cement (HardiePlank-type lap and panel) cut, gapped, and fastened to manufacturer specification.

04

Exterior Trim, Soffit & Fascia

Corner boards, frieze, window and door trim, and soffit and fascia run straight and ventilated to close the eaves and finish the roofline.

05

Flashing & Water Management

Window, door, and transition flashing integrated with the siding and house wrap to shed water.

06

Decks & Rail Systems

Deck framing, decking, stairs, and rail systems built square, fastened to structure, and tied into the envelope.

Why It Matters

Siding is the building envelope

Siding is the building's exterior envelope and its primary water management layer. The transitions where it meets windows, doors, trim, and flashing are where infiltration begins, and where detailing failures show up as callbacks.

D'Matos executes the exterior with the same detail applied to the interior: trim that frames clean, flashing integrated behind the siding, and transitions detailed to shed water, all tied into the finish scope.

The System

Scoped before we mobilize. Documented at closeout.

Scope confirmed before mobilization. Communication documented throughout. Closeout delivered without chasing.

Before

Scope defined before mobilization

Siding scope confirmed in writing, with materials, exposures, and flashing details reviewed before mobilization.

During

Structured weekly updates

Weekly progress updates and documented change orders, so project status stays current.

After

Documented closeout

Weather-tight envelope, photos, and a documented handoff at closeout, completed without chasing.

Proof

The exterior envelope, detailed

Exterior siding and trim work: cladding, trim, soffit, and flashing detail. Select an image to view it in detail.

Working on a project right now?

Send us your plans and get a detailed exterior scope review back within one business day, at no cost.

Send Your Plans