For a project manager, the quality of the finish stage is mostly decided before it starts. Finish carpentry runs downstream of every other trade, so how framing, mechanical, and paint are sequenced determines what the finish crew inherits.
Finish goes in near the end, on top of whatever the trades ahead of it leave behind. For the project manager, that means every sequencing decision made earlier lands on the finish crew, and every upstream miss becomes visible at the finish stage.
It is also the stage the owner sees, so a sequencing problem that stayed hidden for months tends to surface exactly where it is most noticeable.
Paint timing, mechanical rough-ins, and flooring all interact with trim, doors, and millwork. Sequenced with the finish stage in mind, they hand the crew clean conditions. Sequenced without it, they force the crew to work around other trades.
For a PM coordinating overlapping trades, those calls are the difference between a finish stage that runs and one that fights itself.
A finish sub that states what needs to be complete before it starts, and in what order, gives the project manager something concrete to schedule around. The requirement lands while there is still time to plan for it.
The alternative is the crew raising it on arrival, which is the same information delivered at the point where the PM can no longer act on it cheaply.
When the sequence is agreed in advance, the finish crew knows when the site will be ready and the project manager knows the finish stage will hold its slot. The last trade stops being the one that inherits every earlier delay.
That is a schedule the PM can defend, because the most downstream stage is the one that was planned for first.