Terms of Use

1.Terms of Service

1. Terms

By accessing the website at D’Matos Construction INC you are agreeing to be bound by these terms of service, all applicable laws and regulations, and agree that you are responsible for compliance with any applicable local laws. If you do not agree with any of these terms, you are prohibited from using or accessing this site. The materials contained in this website are protected by applicable copyright and trademark law.

2. Use License

  1. Permission is granted to temporarily download one copy of the materials (information or software) on D’Matos Construction INC’s website for personal, non-commercial transitory viewing only. This is the grant of a licence, not a transfer of title, and under this licence you may not:
    1. modify or copy the materials;
    2. use the materials for any commercial purpose, or for any public display (commercial or non-commercial);
    3. attempt to decompile or reverse engineer any software contained on D’Matos Construction INC website;
    4. remove any copyright or other proprietary notations from the materials; or
    5. transfer the materials to another person or ‘mirror’ the materials on any other server.
  2. 2. This licence shall automatically terminate if you violate any of these restrictions and may be terminated by D’Matos Construction INC at any time. Upon terminating your viewing of these materials or upon the termination of this licence, you must destroy any downloaded materials in your possession whether in electronic or printed format.

3. Disclaimer

  1. 1. The materials on D’Matos Construction INC’s website are provided on an ‘as is’ basis. D’Matos Construction INC makes no warranties, expressed or implied, and hereby disclaims and negates all other warranties including, without limitation, implied warranties or conditions of merchantability, fitness for a particular purpose, or non-infringement of intellectual property or other violation of rights.
  2. 2. Further, D’Matos Construction INC does not warrant or make any representations concerning the accuracy, likely results, or reliability of the use of the materials on its website or otherwise relating to such materials or on any sites linked to this site.

4. Limitations

In no event shall D’Matos Construction INC or its suppliers be liable for any damages (including, without limitation, damages for loss of data or profit, or due to business interruption) arising out of the use or inability to use the materials on D’Matos Construction INC’s website, even if D’Matos Construction INC or a D’Matos Construction INC authorised representative has been notified orally or in writing of the possibility of such damage. Because some jurisdictions do not allow limitations on implied warranties, or limitations of liability for consequential or incidental damages, these limitations may not apply to you.

5. Accuracy of materials

The materials appearing on D’Matos Construction INC’s website could include technical, typographical, or photographic errors. D’Matos Construction INC does not warrant that any of the materials on its website are accurate, complete or current. D’Matos Construction INC may make changes to the materials contained on its website at any time without notice. However D’Matos Construction INC does not make any commitment to update the materials.

6. Links

D’Matos Construction INC has not reviewed all of the sites linked to its website and is not responsible for the contents of any such linked site. The inclusion of any link does not imply endorsement by D’Matos Construction INC of the site. Use of any such linked website is at the user’s own risk.

7. Modifications

D’Matos Construction INC may revise these terms of service for its website at any time without notice. By using this website you are agreeing to be bound by the then current version of these terms of service.

8. Governing Law

These terms and conditions are governed by and construed in accordance with the laws of D’Matos Construction INC and you irrevocably submit to the exclusive jurisdiction of the courts in that State or location.